Cost & Efficiency · Enterprise AI Delivery

Cut cost, lift output —
start where the cost leaks

Cutting cost is not cutting budget, and lifting output is not buying another system. We do one thing: find the steps that eat the most hours, replace them with systems that run, then reconcile with you on hours saved and errors removed.

  • 4 weeks From kickoff to the first comparable numbers
  • 1 pilot One scenario proven before anything scales
  • No fee On-site assessment and opportunity list, before you commit

Estimate what you can save Book an on-site assessment

Cost map

Cost is rarely spent at once
it leaks every day

Most of the cost in a company never appears on a purchase order — it sits in the daily repetition. These five are the most common leaks, and each one converts into hours or money. If it cannot be measured, we do not call it a saving.

LeakHow it leaks todayHow we measure itWhat closes it
  • Labour hours Data entry, report assembly, copying numbers between systems — dozens of times a day. Minutes per document × volume × hourly cost Document capture, automated reporting
  • Errors Manual entry goes wrong; rework, rejections and a second reconciliation follow. Error rate × rework cost × monthly volume Rule validation, visual inspection
  • Waiting Waiting on approvals, on data, on an answer — the process stalls in the middle. Average wait × monthly frequency Workflow automation, knowledge Q&A
  • Duplicate builds Every department buys its own tool, keeps its own copy of the data, then wires another interface. Duplicate licences + duplicated build hours One shared platform layer, 38 in-house products
  • Knowledge loss When the experienced engineer leaves, the process parameters and judgement go with them. Months before a new hire works unaided Knowledge base, documented delivery

Return estimate

Enter four numbers
and see whether the maths works

This is a model, not a promise. It does one thing: turns your reading of the current state into hours and money, so you can decide whether the project is worth starting. Real figures come from the on-site assessment.

300
CNY 9,000
15%
25%
CNY 1.2M

Result

  • —Hours saved per year
  • —Annual saving
  • —Equivalent headcount released
  • —Payback period

Based on 21.75 working days per month and 8 hours per day; pay is gross, including the employer's social insurance and housing fund share; payback = one-off investment ÷ annual saving. The result reflects only the assumptions you entered and is not a guarantee of outcome.

Recalculate with real on-site data

Scenario list

The savings come
from a short list of places

We have delivered these repeatedly across manufacturing, chemicals, trading and medical-device companies in Shandong. Each line states the acceptance measure — not "it went live", but "how much faster, how many fewer errors".

ScenarioHow it works todayAfter deliveryAcceptance measure
  • Inbound / outbound documents Typed by hand, 3–5 minutes each, backlog cleared at month end. Captured from photo or scan, written back to the system. Minutes per document, error rate
  • Inspection records and reports Written on paper, retyped into Excel, reports assembled by hand. Visual judgement, reports generated from the template. Hours per batch, miss rate
  • Customer enquiries and after-sales Staff search manuals and chat history for answers. Knowledge base answers first, unclear cases go to a person. First response time, first-contact resolution
  • Reconciliation and invoice checks Two spreadsheets compared line by line, differences found by eye. Rules engine verifies, exceptions listed out. Hours per cycle, exception detection rate
  • Scheduling and work reporting Passed by phone and WeChat groups; progress requires asking. System scheduling, mobile scan-to-report. Scheduling time, on-time reporting rate
  • Inspection rounds and work orders Paper forms, re-entered back at the office. Mobile rounds, exceptions dispatched automatically. Coverage rate, work-order closure time
  • Process and regulatory documents Held in senior staff memory; new hires ask around. Document Q&A with version and validity tracking. Time to find an answer, wrong-answer rate
  • Management reporting Assembled by hand from several systems every week. Scheduled extraction, fixed and traceable definitions. Time to produce, definition consistency

Delivery path

Enterprise AI delivery
at a pace that holds

AI projects rarely fail on technology. They fail because the first phase is too big. We shrink it: prove one scenario with numbers first, then talk about scaling.

  1. 01

    On-site assessment

    An engineer walks the process, marks the three steps that consume the most hours, and records the pre-project hours and error rates as a baseline.

    Deliverable: opportunity list + baseline Timing: week 1
  2. 02

    Smallest working loop

    One scenario made to work on real data, live from day one, recording post-project hours against the baseline.

    Deliverable: running system + before/after Timing: weeks 2–4
  3. 03

    Rollout

    The second and third scenarios reuse the same platform layer — no rebuilding the data layer or interfaces, so the savings are not eaten by a second build.

    Deliverable: multi-scenario live + playbook Timing: months 2–3
  4. 04

    Your team takes over

    Training, documentation and the bad-case feedback loop are handed over. After we leave, your team can change, extend and maintain it.

    Deliverable: certification + full docs Timing: from month 4

Start with the numbers

Take one assessment
no fee, no sales pitch

Bring one process or one document — nothing else is needed.
If the scenario does not hold up, or the data is not there, we say so and point to an alternative.

Assessment

Mark the hours that leak

An engineer follows the process once and lists the repetitive steps, their frequency and the time each one takes.

Opportunity list

What is feasible, and what comes first

Ranked by return, with the data required, the systems affected and what your team needs to contribute.

Measurement

Agree how the saving is counted

A baseline definition for before and after, so acceptance uses the same ruler — no changing the formula later.